Extended Torsion Key Bolts, Longer Torsion Bar Adjustment Bolts Compatible with

Extended Torsion Key Bolts, Longer Torsion Bar Adjustment Bolts Compatible with

USD 35.29 USD
SKU: EpCUm1gJ
Condition: New
Categories: Agriculture

Specifications

Set NamePack Of 2
Fastener TypeHexagon Bolt
Metal TypeAlloy Steel
Part NumberExtended M12
Manufacturer GradeGrade 12.9
ColorBlue
Head StyleRound
Head TypeRound
Item ShapeRound
Model NumberExtended M12
Exterior FinishZinc
Thread CoverageFully Threaded
Thread TypeMetric
MaterialAlloy Steel
Unit Count1.0
Package Dimensions LxWxH3.78x3.43x0.71 Inches
Weight0.37 Pounds

1 pair of extended torsion key adjuster bolts with round tip (Upgrade), replace parts number6, work with 11561233.

Related Items